1. All lubricating oil should be discharged when the mill is put into continuous operation for one month, thoroughly cleaned and replaced with new oil. After the combined repair, the oil will be changed every 6 months.
2. Check the lubrication condition and oil level of each lubrication point at least every 4 hours.
3. When the mill is running, the temperature rise of the main bearing lubricant does not exceed 55 ° C.
4. During normal operation of the mill, the temperature rise of the transmission bearing and the reducer does not exceed 55 ° C, and the higher does not exceed 60 ° C.
5. The large and small gears are driven smoothly without abnormal noise. If necessary, the gap should be adjusted in time.
6. The ball mill runs smoothly without strong vibration.
7. The motor current should be free from abnormal fluctuations.
8. There is no loosening of each connection fastener, no oil leakage, no water leakage, no ore leakage on the joint surface.
9. Steel balls are added in time according to the wear condition.
Can the aluminum alloy be used as aluminum powder? 10. If abnormal conditions are found, the grinding and maintenance should be stopped immediately.
11. The ball mill liner should be replaced when it is worn by 70% or has a crack of 70mm length.
12. Liner bolts are damaged and should be replaced when loose.
13. The main bearing should be replaced when it is severely worn.
14. The ladle plate of the lattice ball mill is worn so that it can no longer be repaired.
15. The gear face of the large gear can be turned over and continued to be used after a certain degree of wear.
16. The pinion should be replaced if it is severely worn.
Ansteel Aluminium Powder 17. Welding should be done in time when the spiral of abrasion of incoming and outgoing materials is worn out, and it should be replaced when it is worn out.
18. Loose or damaged anchor bolts should be repaired in time.
A regular task in the maintenance of aluminum powder ball mills. The quality of the maintenance work directly affects the operation rate and service life of the energy-saving ball mill. In order to find defects in time and eliminate hidden dangers to ensure the normal operation of the mill, in addition to routine maintenance, grinding needs to be stopped regularly (once a month is recommended). Important components such as hollow shafts, main bearings, cylinders, reducers, Gears and other gears are carefully checked and detailed records are made. According to the situation of the defects, make appropriate treatment and arrange the repair and overhaul plans.
18 tips for daily maintenance of aluminum powder ball mill-what is the use of high aluminum powder
2020 03/16
